Our Activities

Our Activities

Nestoil's experience covers the entire value chain, from oil and gas Engineering and Procurement to Construction and Commissioning.

The majority of our projects are geographically challenging, marked by swampy and muddy terrains. Some of our activities – past and present - are featured below:

PIPELINE CONSTRUCTION

K2S Project

  • Project: 20" Gas Pipeline to reroute Kolo Creek Gas to Soku Gas Plant
  • Location: Bayelsa State
  • Client: Shell Petroleum Development Company SPDC
  • Terrain: Swamp

Overview
We are currently executing the Engineering, Procurement, Construction, Installation and Commissioning of the gas pipeline in Gbaran area.

View Project Gallery

OB3 Project (Lot A)

  • Project: 48" diameter Gas Pipeline from Obiafu/Obikrom to Oben
  • Location: Rivers State/ Bayelsa State/ Delta State/ Edo State
  • Client: Nigerian National Petroleum Corporation (NNPC)
  • Terrain: Land (dominant) and seasonal swamp

Overview
OB3's 48" diameter gas pipeline is the largest pipeline ever constructed in Nigeria, and the first phase of Nigeria's Gas Masterplan. We are currently constructing LOT A, which involves the Engineering, Procurement and Construction of the Pipeline from Obiafu/Obrikom Central Processing Facilities in Rivers State to Ogbe Intermediate Pigging Station in Edo State.

View Project Gallery

NCTL Project (Package A)

  • Project: 48" diameter Gas Pipeline from Obiafu/Obikrom to Oben
  • Location: Bayelsa State/Rivers State
  • Client: Shell Petroleum Development Company SPDC
  • Terrain: Mangrove Swamp/ Creeks

Overview
The NCTL project involved replacing over 1,000 km of deteriorated major pipelines and flowlines. We completed Package A of the project which involved constructing a pipeline in a harsh swampy terrain to traverse 3 cluster communities and 100 independent communities in Bayelsa and Rivers State.

Installing the pipeline required us to make 7 major river crossings and another 44 smaller rivers or creek crossings. We performed extensive dredging activities(clampshell, floating equipment and suction dredging), as well as fabricated and installed 2 new Tie-in manifold at Nembe and San Barth., which hook up to 6 other manifolds, 4 pig traps and associated piping.

We completed and commissioned this project in September 2010, one month ahead of schedule – without a single fatality in spite of the potential security risks from the communities. The project earned us several commendation awards from Shell, and following our success in river crossings and dredging, another company working on this project utilized our services for the dredging and crossing of Krakrama and san Barth Rivers.

View Project Gallery

Shell-Belema Delivery Line Replacement Project

  • Project: Shell-Belema Delivery Line Replacement Project
  • Location:
  • Client: Shell Petroleum Development Company SPDC

View Project Gallery

DOMGAS Pipeline Project

  • Project: Domestic Gas (DOMGAS) Pipeline Project
  • Location:
  • Client: Mobil Producing Nigeria (MPN)

View Project Gallery

Alaoji Gas Pipeline Project (Mobil)

  • Project: Alaoji Gas Pipeline Project
  • Location: Alaoji
  • Client: Mobil Producing Nigeria (MPN)

View Project Gallery

FACILITIES UPGRADE

Crude Condensate Storage Settling Tank Revamp Project

  • Project: Crude Condensate Storage Settling Tank Revamp
  • Location: OuaIboe Terminal (QIT), Eket, AkwaIbom
  • Client: Mobil Producing Nigeria (MPN)
  • Terrain: Land (dominant) and seasonal swamp

View Project Gallery

Opukushi Project

  • Project: Flowstation Development Works
  • Location: Delta State
  • Client: Shell Petroleum Development Company SPDC

View Project Gallery

Otumara Project

  • Project: Otumara Flowstation Debottlenecking Train 3 Works
  • Location: Delta State
  • Client: Shell Petroleum Development Company SPDC

View Project Gallery